A selection of projects completed since 2013 – from single valves and heat exchangers to complete skids.

Barossa FPSO – BW Offshore

Project page →
Steam generator skid for Barossa FPSO with vessels, piping and valves on a green frame

Steam generator skid

One complete steam generator skid, to be installed on the ship deck. The skid is Ex/IECEx safe for potentially explosive atmospheres.

  • – Kettle type hot water steam generator
  • – Pneumatically operated control and shut-down valves
  • – Condensate cooler
  • – Feedwater tank
  • – 2 × 100% feedwater pumps
  • – Instruments and transmitters
Scope
Complete skid
Hazardous area
Ex/IECEx

Maria Quitéria FPSO – Techouse

Project page →
Vahterus PSHE 12 Steam Extraction Heater for Maria Quitéria FPSO in the workshop

Steam Extraction Heaters (condensers)

Two Steam Extraction Heaters (condensers), Plate & Shell heat exchanger model PSHE 12, including spare plate pack for maintenance.

Model
PSHE 12
Duty
22 MW
Weight
12.3 t each
Height
2.3 m
Plate & Shell Condensate Cooler with Condensate Hotwell for Maria Quitéria FPSO

Condensate Coolers with Condensate Hotwell

Two Condensate Coolers including Condensate Hotwell, Plate & Shell heat exchanger model PSHE 5/3, including spare plate pack for maintenance.

Model
PSHE 5/3
Duty
690 kW
Weight
2.8 t each
Height
3.8 m

Karish FPSO – KANFA

Flash Gas Compressor Cooler for Karish FPSO

Flash Gas Compressor Coolers

Four Flash Gas Compressor Coolers.

  • – 1 × 1st stage suction cooler
  • – 1 × 2nd stage suction cooler
  • – 1 × 3rd stage suction cooler
  • – 1 × 3rd stage after cooler
Units
4 coolers
Design pressure
Up to 90 bar

Johan Castberg FPSO – Equinor

Project page →
Shunt skid in stainless steel for Johan Castberg FPSO

Shunt skid

One complete shunt skid built to control chilled water for cooling applications on the FPSO.

  • – Pneumatically operated 3-way valve
  • – Balancing valves
  • – Stop valves
  • – Instruments
Material
SS AISI 316
Hazardous area
Ex/ATEX

Tyra Gas Field Redevelopment – Total

Insulated water/glycol pump skid for the Tyra Gas Field Redevelopment

Water/glycol pump skid

A complete pump skid built to circulate chilled water for cooling applications on the platform. The skid includes expansion tank, pipeline equipment, instruments and junction boxes. Insulation with cellular foam glass with AISI 316 encapsulation.

Pumps
2 × centrifugal, 258 m³/h each
Supply pressure
6 bar
Material
SS AISI 316
Hazardous area
Ex/IECEx
Water/glycol shunt skid with 3-way valve for the Tyra Gas Field Redevelopment

Water/glycol shunt skids

Two complete shunt skids including pneumatically operated 3-way valve, balancing valves, stop valves and instruments, built to control chilled water for cooling applications on the platform. Insulation with cellular foam glass with AISI 316 encapsulation.

Units
2 skids
Material
SS AISI 316
Hazardous area
Ex/IECEx

Gimi FLNG – Golar LNG

Small bore valves on pallets for Gimi FLNG

High, mid and low pressure valves

Small bore valves from Bonney Forge for engine room/steam boiler refurbishment for Gimi FLNG at Keppel, Singapore. The delivery also included larger valves and steam traps.

Quantity
480+ valves
Ratings
1500/600/150 lbs
Leser steam pressure safety valves for Gimi FLNG

Steam pressure safety valves

Pressure safety valves from Leser for engine room/steam boiler refurbishment for Gimi FLNG at Keppel, Singapore.

Quantity
20 valves
Ratings
1500/900/150 lbs
Sizes
1½″×2″ to 6″×8″
Set pressure
Up to 92 barg

MIDIA Black Sea Gas Development – Fjords Processing

Plate & Shell heat exchanger for the MIDIA Black Sea Gas project
Second Plate & Shell heat exchanger for the MIDIA project

Lean/Rich TEG and MEG heat exchangers

One Lean/Rich TEG and one Lean/Rich MEG Plate & Shell heat exchanger delivered for the MIDIA Black Sea Gas project.

Units
2 Plate & Shell heat exchangers

Tortue Gas Field, Mauritania/Senegal – BP / TechnipFMC

Actuated valves for the Tortue gas field on pallets

Control and on/off valves

Actuated valves for the Tortue gas field development.

  • – 3-port modulating control valves with 230 V 60 Hz Ex de actuators, HART protocol
  • – 2-port on/off valves with 230 V 60 Hz Ex de actuators, 24 V DC control unit
Actuators
Ex de, 230 V 60 Hz

Peregrino C living quarter – Equinor

Insulated shunt/pipe skid for Peregrino C living quarter

Shunt/pipe skids

Two complete shunt/pipe skids including electrically operated 3-way valve, balancing valves, stop valves and instruments, built to control chilled water for cooling applications on the platform. Pipes and equipment in carbon steel painted according to project specifications, insulated with external weather protection.

Units
2 skids
Material
Carbon steel, painted
Hazardous area
Ex/IECEx

Chang Hua Wind Farm – Two unmanned rigs

Aluminium bronze strainer for Chang Hua Wind Farm
Actuated butterfly valves for Chang Hua Wind Farm

Valves and equipment for chilled water system

Various valves and equipment for the chilled water system on two unmanned rigs.

  • – Balancing valves
  • – Ball valves
  • – Check valves
  • – Strainers
  • – Manual and automated butterfly valves
  • – Air vents
  • – Pipe flexibles
Material
Aluminium bronze C95800

Technical contact

Planning a similar delivery?

Kaare F. Roestad

General Manager, Heatex Norway AS